Boutique apartment living in the heart of Lambton. Consisting of 15 apartments and 3 retails suites. Consists of over 100 window and door elements.
The industrial unit reimagined
The industrial unit reimagined
GWH
Industrial Development
Steel River, Mayfield West
Commercial Framing, Windows and Doors
Located in the Steel River industrial precinct, these units provide a wider use case by offering services not generally associated with industrial units.
To make these spaces usable and inviting for businesses and individuals meant windows! And lots of them.
All units overlooking the river boasted floor to ceiling glazing measuring a massive 3m wide and 5.8m high.
Across the development, Hunter Windows designed, manufactured and installed our largest industrial windows project to date, with 131 louvre windows, as well as 27 hinged, and 22 bi-fold glass doors.
The end result was quite stunning, and once again we are proud to have teamed up with other Hunter businesses (Hunter Precast, Hunter Structural Steel) and GWH on this project.
Contact our specialised team for more information about our products and how we can meet your specifications.
Boutique apartment living in the heart of Lambton. Consisting of 15 apartments and 3 retails suites. Consists of over 100 window and door elements.
Client: GWH
Duration: June 2024 – September 2025
Hunter Windows manufactured, supplied and installed a complete glazing package for ONE Apartments, a dual-tower residential development located in Newcastle West.
The scope incorporated extensive glazing systems across both towers and podium levels, totalling 9,116m³ of glazing and 3,697 individual glass panels.
Key inclusions:
Podium Levels (GF–L3): Shopfronts, sliding and hinged doors, fixed glazing, and awning windows for commercial and residential areas
South Tower (L4–L19 + Roof): Mixture of sliding doors, fixed glazing, hinged doors and awning windows
North Tower (L4–21 + Roof): Mixture of sliding doors, fixed glazing, hinged doors and awning windows
Winter Gardens: Fixed glazing and Safetyline Jalousies
Comprehensive design and compliance processes included:
372 shop drawings prepared to document the project
349 QA ITPs completed to verify installation quality
Water testing completed in conjunction with façade consultant Indesco and third-party testing to ensure design compliance and watertightness