Consisting of a new Supermarket (inclusive of Back of House with Mezzanine Offices, Loading Bay and Plant Deck), seven speciality shops and customer amenities. Together with GWH and our partners in the Hunter Construction Group, the construction used structural steel frame, precast cladding and commercial grade windows & doors.
Macquarie Tower
Client: GWH
Duration: July 2024 – June 2025
Hunter Windows manufactured, supplied and installed a comprehensive suite of aluminium and glazing systems for the 15-storey Macquarie Tower commercial development in Charlestown.
The scope included:
-
Ground Floor Shop Fronts featuring high-performance glazing systems
-
Child Care Centre (Level 3) with fixed glazing, sliding and hinged doors
-
Curtain Wall façade across Levels 4–7
-
Mixed glazing package across upper levels incorporating sliding doors, fixed glazing, hinged doors, sliding windows and awning windows
In total, over 3,698m³ of glazing and 2,376 individual glass panels were installed.
Comprehensive QA and compliance processes were implemented, including:
-
202 shop drawings produced to document design and fabrication
-
416 QA ITPs completed (one for every window)
-
Watertesting undertaken in conjunction with façade consultants Indesco to verify design performance and watertightness