Commercial Framing Specialists

Summary
  • Client

    Service Centre Developer

  • Sector

    Commercial

  • Location

    Belmont, Lake Macquarie

  • Products

    Commercial Framing

Scope

Manufacture and install of commercial windows and doors for fast food and service station.

This new service centre located in Belmont boast a Metro Service Centre, Guzman Y Gomez Mexican kitchen and Subway sandwich shop.

Manufacture and install included commercial windows and doors, specialist drive-thru windows and retail spec automatic doors.

Partner with us on your next project

Contact our specialised team for more information about our products and how we can meet your specifications.

Our Projects

Aluminium Windows and Doors
Aluminium Windows and Doors
Aluminium Windows and Doors
Aluminium Windows and Doors

Cubby Hole

An industrial micro unit build with a difference. Plenty of natural light via 131 louvre windows, 22 glass bi-folds and 27 glass hinged doors.

Hunter Windows ONE Apartments Newcastle West
Hunter Windows ONE Apartments Newcastle West
Hunter Windows ONE Apartments Newcastle West
Hunter Windows ONE Apartments Newcastle West

ONE Apartments

Client: GWH
Duration: June 2024 – September 2025

Hunter Windows manufactured, supplied and installed a complete glazing package for ONE Apartments, a dual-tower residential development located in Newcastle West.

The scope incorporated extensive glazing systems across both towers and podium levels, totalling 9,116m³ of glazing and 3,697 individual glass panels.

Key inclusions:

  • Podium Levels (GF–L3): Shopfronts, sliding and hinged doors, fixed glazing, and awning windows for commercial and residential areas

  • South Tower (L4–L19 + Roof): Mixture of sliding doors, fixed glazing, hinged doors and awning windows

  • North Tower (L4–21 + Roof): Mixture of sliding doors, fixed glazing, hinged doors and awning windows

  • Winter Gardens: Fixed glazing and Safetyline Jalousies

Comprehensive design and compliance processes included:

  • 372 shop drawings prepared to document the project

  • 349 QA ITPs completed to verify installation quality

  • Water testing completed in conjunction with façade consultant Indesco and third-party testing to ensure design compliance and watertightness

Menu